Based on the analysis of existing facilities and odor analysis results, we will examine the solutions to the problems of the existing facilities; we will examine various aspects of efficiency improvement measures such as the operation conditions of the chemicals, pH, process quantity, addition of fillings, residence time, load operation, amount of activated carbon adsorption, and replacement cycle.
In order to examine the optimum odor reduction measures, reasonable facility improvement plan is derived considering convenience such as appropriate capacity of preventive facility, structure durability, and facility maintenance. When installing a new facility, the actual odor reduction efficiency, efficiency of space use for facilities and work line are reviewed.
Working design | Details |
---|---|
Air volume review and calculation | Deodorizing duct air volume review by process |
DUCT design | Deodorizing duct for each process |
Implementation design | Odor prevention facilities design |
Additional facilities and other facilities design | |
Electrical and instrumentation design | |
Drawings | DUCT LINE design drawings |
New and additional prevention facilities and related facilities | |
Electrical and instrumentation | |
Report | Basic and working design report |
Drawing up of specification and design specification | |
Drawing up of design budget form |